Traffic Advisory: BC Hydro Median Reinstatement Veterans Memorial Parkway (South of Kelly Road)

Type(s)
Public Notice
Image
Banner apologizing for traffic delays due to improvements in Colwood.

Improvements are happening in Colwood that are expected to impact travel times. If possible, you may wish to travel outside of peak hours or choose an alternate route. 

When: Tuesday, May 3, 2022, to Thursday, May 5, 2022; between 9:00pm to 3:00am

Where: Veterans Memorial Parkway (south of Kelly Road)

What: BC Hydro – Concrete Median reinstatement


Image
Aerial view of Kelly Road, Veterans Memorial Parkway, and Sooke Road intersection with marked work zone for single-lane traffic from 9 a.m. to 3 p.m.


BC Hydro will be performing concrete median reinstatement on Veterans Memorial Parkway (south of Kelly Road).
Both north and southbound lanes will be affected. Traffic will be reduced to single lanes in both directions during the reinstatement works.
Traffic Control Personnel will be on site. Delays are to be expected. Motorists, cyclist and pedestrians please be aware and follow all signs and Traffic Control Personnel instructions.

Contact for the works

BC Hydro
250-755-7180


Get more details about road improvements and check traffic maps at: Colwood.ca/Roads