When: Friday, September 2, 2022, between 5:00pm and 5:00am
Where: Sooke Road at 598 Heatherly Road
What: Sanitary sewer connection and pavement restoration
The developer will be installing sanitary sewer connection on Sooke Road for 598 Heatherly Road beginning the evening of Friday, September 2, 2022, at 5:00pm through the night until 5:00am
Both travel lanes will be closed fronting this property and therefore, single lane traffic will be required to use the left turn lane for north bound traffic. Travel times will be impacted between Metchosin Road and Kelly Road. Using alternate route is suggested.
Emergency vehicle access will be maintained at all times.
Traffic personnel will be onsite to direct traffic. Please follow their directions, obey traffic signs, and use caution.
Contact for the works:
Rolland Holdings – Todd Mizuik
250-589-4041 or toddmizuik@rollandholdings.com
Get details and check traffic maps at Colwood.ca/Roads